416

  • +10Trades on the card
    Tiling to trimwork
  • +02Weeks, full house
    Oakville, 2025
  • +01Day, shower walls
    Panel system

Bathrooms, kitchens and full renovations. Toronto to Oakville.

02What we do, in the order a house needs it

  1. DemolitionBack to the studs
  2. FramingNew walls, square openings
  3. DrywallHung, taped, sanded
  4. PargingFoundation walls
  5. StuccoOutside faces
  6. TilingSet on levelling clips
  7. LaminateFloors, tight to the wall
  8. TrimworkBaseboard, casing, panels
  9. PaintingWalls, doors and trim
  10. BathroomsAll of it, in one room

01/ 10Their own site photos, as shot

Dive

04Every tile is a room we finished

  1. 01
  2. 02
  3. 03
  4. 04
  5. 05
Brass bathroom
Toronto

×1.0Scroll to diveClick any tile to choose the room

Bathroom with a glass shower, sage vanity and navy hexagon floorSage vanity with a bevelled mirror and brass sconcesBrass rain head and valve on white stacked tileNavy hexagon floor and sage panelled tubWhite stacked tile shower with a pebble floorSage panelled tub under a window

05Project

Vertical stacked tile with a pebble floor, two niches on the tile line, brushed brass, sage panels and a navy hex floor.

See the project

Brass bathroom

01/ 06

Bathroom with a freestanding tub, charcoal floor and a glass shower with black fittings

Matteblackoncharcoal

06Glenbrea

Large-format porcelain, a freestanding tub under the window, a glass shower with black fittings and a stone bench.

Matte black hand shower and body controls on grey porcelain

2Weeks

  • +01Floors
    Through the house
  • +02Paint and trim
    Every room
  • +03Fireplace
    Refaced in charcoal
Living room with a charcoal stone fireplace and oak floors

“Full house transformation in 2 weeks.”Their words, February 2025. Oakville.

07Oakville

08Close up

The part you touch

Pebble mosaic shower floor with a round drain
Pebble floorCut tight to the drain
Blue grey herringbone tile beside white porcelain
HerringboneGlossy blue grey, Fermanagh Ave
Brass valve on white tile
Brass trimCentred on the joint
Shower opening framed in charcoal tile
Framed openingCharcoal trim, mitred corners
Teal powder room with a marble vanity
Powder roomTeal walls, marble top
Freestanding tub by a window
TubSet level on large tile
Shower walls
done in
one day

“Faster and easier way to get your shower walls done in 1 day. It can go over existing tiles or on a new drywall.”Their words. The panel system, 2023.

09Shower wall panels

10Call us for

  • Bathroom remodellingDemolition to glass01
  • KitchensCabinets, tops, tile02
  • Full houseFloors, paint, trim, doors03
  • BasementsFraming, drywall, pot lights04
  • Tile workFloors, walls, showers05
  • Feature wallsPanels, fireplaces, stone06

11416 Contracting Inc.

Named after Toronto’s area code. Built for the houses in it.

White kitchen with a walnut island and oak floors

We are a renovation crew. The card says tiling, stucco, drywall, framing, demolition, parging, painting, trimwork, laminate and bathroom remodelling, and that is the work.

Book a site visit

12Book a site visit

Tell us about the room

The room
647 449 3508416contractinginc@gmail.comInstagram @416contractinginc